Porto do Molle, Nigrán
Project context
Brigal has experienced a 75% growth in recent years, with exportation being the company’s top priority. To face the new clients’ demand, Brigal has commissioned a new 3,700m2 facility, hosting all the processes under one sole structure. The new building is designed by the architect Borja Ramilo.
Soltec Ingenieros services
- The design was adapted to the production and storage of chemical products, which has challenged the projected installations.
- A design of the production layout that optimises resources.
- Design, calculation and development of the building services: air-conditioning, electrical and compressed air installation.
- Compliance management of the building requirements, legislation and regulations according to Brigal’s activity.
- Onsite works supervision.
Added Value
- Posterior study and construction of a distribution station and a 640KVA 20KV/400V transformation station.
- Fire life safety project.