Muras, Lugo
Project context
Wind farm project in an area of 100 Ha, with the aim of developing successive extensions of power increase. Our team implemented 8 wind turbines of 2 MW each. The project started with four 2 MW generators. Other four were added in the second phase.
Soltec Ingenieros services
Detailed engineering of the construction project:
- Calculation of wind potential and selection of turbines.
- Geotechnical study.
- Sizing of vials.
- Foundations.
- Control building.
- 20kw electricity distribution network.
- 20kw /132kw substation.
Added Value
Environmental study of the farm effects on its implantation area.