Project context​
The Saudi Railway Organization (SRO) appointed a consortium of 12 Spanish and 2 Saudi firms to complete the Phase 2 works on the Makkah-Madinah Haramain High Speed Line. To that date, this had been the largest international contract ever given to Spanish companies. ​
To enable the works, four work bases were built. Soltec Ingenieros was appointed by the consortium on the Work Base 3 project (P.K. 350+750), covering an area of 180,000m2. ​

Soltec Ingenieros services​

  • Detail engineering and sizing of the general services and infrastructures of the “life camps”, accommodating +500 people involved in the project or from the industrial area.​
  • Detail engineering of the running water, air-conditioning and sanitation utilities.

Added Value

We’ve carried out detail engineering and sizing works according to the Saudi Building Code (SBC), and considering a desert climate zone. ​