Petrochemical complex for the manufacturing of glue, resins and other products

Mugardos, A Coruña

Project context​
Forestal del Atlántico complex required the installation of a boiler for the production of steam for the glues and formaldehyde manufacturing processes, management of MARPOL resources and the reception, storage and distribution of liquid bulk.​


Soltec Ingenieros services​

  • Development of the whole and detailed engineering study and technical project for the installation of the industrial steam boiler unit and all of its auxiliary equipment.​
  • Security, fire and electrical power safety measures, according to the current legisltion.​
  • Calculations for the additional two-deck storage tank domes.​
  • Project controls, monitoring and works supervision during 4 months.​

Added Value

  • We’ve installed two additional storage domes, each contained in two of the 3.5M litres storage tanks​.
  • Management of MARPOL resources.​